Champlain Wind, LLCBowers

Proposed construction of a 27 turbine, 69.1 megawatts (MW) wind farm to be located in Carroll Plantation, Penobscot County, and Kossuth Township, Washington County. Services included the permit level design of a 34.5-(kV) electrical collector system, an electrical collection substation, an Operations and Maintenance (O&M) building and other potential ancillary improvements associated with the foregoing. The turbines will be constructed on three ridges, and currently three turbine models are being evaluated. SGC also provided survey engineering services for the collector/transmission line, and planned the access roads for construction.

Bowers Wind Project