AustraliaSGC assisted Senergy EConnect Australia with the detailed electrical design for these two wind projects on separate sites in Victoria, Australia. The projects were designed simultaneously under a single contract. Combined, the two projects included 99 2MW Vestas turbines (31 and 68 turbines, respectively) for a total 198 MW. The scope of the projects included the design of the 33 kV underground collector systems for each project including cable sizing, routing and trench design. The design required coordination of cable routing with civil design and detailed coordination of conduit routing through the turbine foundations. In addition to the collector design SGC was responsible for the coordination of the switchgear at the base of the tower and design of trenchless installation methods under public roads.

Hawkesdale / Ryan Corner Wind